PJSC "Linde Gas Ukraine"
According to the technical specifications, a working project was completed for the construction and equipping of the laboratory with the necessary equipment for conducting acetylene analysis.
During the design, it was taken into account that future construction would be carried out in an explosion and fire hazardous area, and therefore all structures and pipelines were made without welded joints on site.
For technological units, highly specialized equipment was selected, allowing for smooth and precise process control.